膜結(jié)構(gòu)車(chē)棚安裝工藝和方法

點(diǎn)擊次數(shù):   更新時(shí)間:2021-08-28 16:04     來(lái)源:未知 【關(guān)閉分    享:

很多想了解膜結(jié)構(gòu)車(chē)棚的朋友對(duì)于安裝工藝和方法很好奇,今天篷王膜結(jié)構(gòu)工程公司的周工程師就帶大家了解一下。
Many friends who want to know about membrane structure carport are curious about the installation process and method. Today, Engineer Zhou of Wang Membrane structure Engineering Company will take you to know about it
膜結(jié)構(gòu)停車(chē)棚

1、膜結(jié)構(gòu)工程一般是一個(gè)非常復(fù)雜的工程,但也有很多細(xì)節(jié),需要考慮和注意:
 
1. Membrane structure engineering is generally a very complex project, but there are also many details that need to be considered and paid attention to:
 
  1、首先,膜結(jié)構(gòu)的項(xiàng)目在實(shí)施前也是需要的。 編寫(xiě)的很詳細(xì),包括:圖紙?jiān)O(shè)計(jì),實(shí)際工程,綜合考慮用戶的特點(diǎn)和要求。
1. First of all, the project of membrane structure is also needed before implementation. The preparation is very detailed, including: drawing design, actual engineering, comprehensive consideration of the characteristics and requirements of users.
 
 
  2、膜結(jié)構(gòu)施工工程的安裝是非常重要的,尤其是要保證膜結(jié)構(gòu)工程的安全,這樣才有可能有效的保證膜結(jié)構(gòu)的巨大便利我們的生活。
2, membrane structure construction engineering installation is very important, especially to ensure the safety of membrane structure engineering, so that it is possible to effectively ensure the great convenience of membrane structure of our life.
 
 
  二、膜結(jié)構(gòu)工程在一般實(shí)施過(guò)程中還會(huì)有哪些需要注意的地方?
Ii. What should be paid attention to in the general implementation process of membrane structure engineering?
  1、從工程設(shè)計(jì)的角度,基于膜結(jié)構(gòu)和膜結(jié)構(gòu)設(shè)計(jì)的全過(guò)程,應(yīng)該是外形設(shè)計(jì)、構(gòu)件設(shè)計(jì)、詳細(xì)設(shè)計(jì)、連接設(shè)計(jì)、剪裁設(shè)計(jì)和施工。 工藝的每一步也將非常重要。
 
  2、員工需要的是細(xì)心的操作,才能保證膜結(jié)構(gòu)工程的正常實(shí)施。
 
  3、其實(shí)前期設(shè)計(jì)很重要,尤其是膜結(jié)構(gòu)工程的可行性和設(shè)計(jì)成本,需要認(rèn)真研究考慮,才能保證項(xiàng)目的正常實(shí)施。
1. From the point of view of engineering design, the whole process of membrane structure and membrane structure design should be shape design, component design, detailed design, connection design, cutting design and construction. Every step of the process will also be important.
 
2, the staff need to be careful operation, in order to ensure the normal implementation of membrane structure engineering.
 
3. In fact, preliminary design is very important, especially the feasibility and design cost of membrane structure engineering, need to be carefully studied and considered to ensure the normal implementation of the project.
膜結(jié)構(gòu)停車(chē)棚安裝
  三、膜結(jié)構(gòu)工程的安裝步驟: 1、基礎(chǔ)工程或施工完成后,安裝主體結(jié)構(gòu)的膜支撐結(jié)構(gòu),完成局部涂裝、防火等。 現(xiàn)在它正在以非常快的速度發(fā)展。 阻燃材料和阻燃材料可用于膜結(jié)構(gòu)工程,可以保證膜結(jié)構(gòu)工程不受火災(zāi)影響,大大提高膜結(jié)構(gòu)工程的安全性。
三. Installation steps of membrane structure engineering: 1. After the completion of foundation engineering or construction, install the membrane support structure of the main structure, complete local painting, fire prevention, etc. Now it is growing at a very fast pace. Flame retardant materials and flame retardant materials can be used in membrane structure engineering, which can ensure that the membrane structure engineering is not affected by fire, and greatly improve the safety of membrane structure engineering.
 
  2、將支撐結(jié)構(gòu)與連接節(jié)點(diǎn)的幾何總和與設(shè)計(jì)值進(jìn)行比較。 那么,在具體實(shí)施過(guò)程中也會(huì)對(duì)所連接的構(gòu)件進(jìn)行適當(dāng)?shù)恼{(diào)整,從而也能夠保證膜結(jié)構(gòu)工程制造的準(zhǔn)確性。
2. Compare the geometric sum of the supporting structure and the connecting node with the design value. Then, in the specific implementation process will also be connected to the components of appropriate adjustment, so as to ensure the accuracy of membrane structure engineering manufacturing.
  3、完成的折疊工序也將按照施工單位的設(shè)計(jì)要求進(jìn)行包裝、貼標(biāo)、運(yùn)輸至安裝現(xiàn)場(chǎng)。
3. The completed folding process will also be packed, labeled and transported to the installation site according to the design requirements of the construction unit.
 
  4、準(zhǔn)備工作是在螺紋后,起重機(jī)械、起重和對(duì)角線要一次固定點(diǎn)。 平衡張力的逐步調(diào)整是薄膜表面的張力。 應(yīng)用過(guò)程中的張力也很重要。 如果自負(fù)不足或過(guò)度自負(fù),也有可能造成膜結(jié)構(gòu)餓了么工程的倒塌或破壞,所以也希望膜結(jié)構(gòu)在此期間多做準(zhǔn)備。
4, the preparation work is in the thread, lifting machinery, lifting and diagonal to a fixed point. The gradual adjustment of equilibrium tension is the tension on the surface of the film. Tension in application is also important. If insufficient or excessive conceit, it may also cause the collapse or destruction of the membrane structure, so it is also hoped that the membrane structure will be prepared during this period.

- 聯(lián)系人:范經(jīng)理 15988080652 ? ? ? ? ? ??
- 座機(jī)號(hào):0578-2278266? ? ? ?
- QQ:196162413 ? ? ? ?- 郵編:323000
- 地址:浙江省麗水市蓮都區(qū)碧湖鎮(zhèn)朗源路17號(hào)
- 網(wǎng)址:http://m.insa-lyon.com/? ? ?- 郵箱:196162413@qq.com

QQ咨詢

電話咨詢

聯(lián)系我們

產(chǎn)品案例

麟游县| 循化| 长武县| 嵊泗县| 吴江市| 宜春市| 涿鹿县| 宣威市| 白沙| 罗源县| 博罗县| 疏附县| 晋城| 历史| 德阳市| 容城县| 吴川市| 江都市| 运城市| 乐都县| 通州市| 科尔| 瑞金市| 江华| 旬邑县| 山西省| 瓮安县| 罗江县| 宁远县| 成安县| 肥东县| 黑河市| 德钦县| 萝北县| 承德县| 吉木萨尔县| 长顺县| 河间市| 正蓝旗| 通许县| 湘潭县|